Feeling much better! Even though things are still on a VERY tight schedule they are moving along right nicely. All of my WAN links are up. My AD is designed and deployed to the first 2 servers. The slow part is the hard disk images. Hopefully by the first of next week all of my remote sites will have servers and switches installed and then we will start converting PCs. We are doing between 1 and 4 per site ahead of time; depending on the number of PCs in each location. Then the evening of 2/2 we will do the rest of the machines. At that time all that will have to be done is put the drive in the PC, boot it up, join the domain and push AV.